Clearing Sewage Man Hole Blockage (Block D)
Date: 29th August 2009
Problem: Blockage of sewage man hole at Block D
Action: Problem tackled by manual clearance of man hole with man hole rod and submersible pump on the 30th and 31st August 2009 respectively.
Photos: <refer below>
Before:

In progress:


After:

Note: Photos uploaded to this site may be too much for some people to digest.
The Management


